Overhaul of the up track in Odesa region
In accordance with the agreement with the regional branch of “Odesa Railway” JSC “Ukrzaliznytsia”, design and cost estimate documentation was developed in compliance with the requirements of the current legislation, construction codes, standards, and regulations for carrying out capital repair of the main track of the section with a total length of 3,414 km. Consequence class (responsibility level) CC3. The expert review resulted in a positive conclusion.